Friday, April 9, 2010

Guangzhou Malt


1990-1993 in Guangzhou Economic and Technological Development Zone, Guangzhou Malt Co., Ltd. as a deputy director of production engineering. During this period involved and responsible for the preparatory work for the company's infrastructure, the company covers an area of about 5 thousand square meters, construction area of 1.3 million square meters, there is the work of 31-storey tower, drum storage (concrete slipform structure) about 95M high and 9 multi-storey cheap polo shirts and low-level structures, plant, ancillary works, dormitories, office buildings, totaling 11 units in the structure, infrastructure works great pit excavation, two large basement (chemical grouting construction), caisson construction. Pile foundation with bored piles, punching piles, precast discount wedding prom dresses strike piles, hammer-situ piles, sand piles, dug pile and so on. Of the above items I in charge of the newspaper building, construction, installation of construction supervision, investment review, quality control, etc., the project investment cost of more than 2700 million in construction, installation investment costs of more than 3500 million. Soil Deputy Construction Main workers Ren Cheng dresses 1std Division 1993-1994 in Guangzhou Panyu Health Yiu Garment dyeing Co., Ltd., the company wedding dresses 2nd appointed engineering director in charge of the company's project preparation, development work, items from the newspaper building, land acquisition, seedlings compensation, the early stage of project development, project design approval , investment feasibility analysis, construction tender, construction supervision, construction progress of investment control, (pre-and final accounts preparation, auditing) to hand over the acceptance of such one-man work, the project has 12-storey factory building, single warehouse, single washing workshop, storage tanks, power plant, boiler plant, five-storey staff Lacoste Polo Shirts quarters, about 5 million chi hair straightener square meters of area, more than 80 million square meters of construction area and the project to, drainage, strong, weak, air-conditioning, fire , municipal roads, landscaping auxiliary projects. Infrastructure investment costs of about 3,500 million. Engineering
http://codenewbie.com/forum
http://www.essentialpim.com/forum
http://www.digitalgangster.com/4um